Scope
ENCO has built many DryMax units for Shindong: dehumidification and cooling for the paint shop in Hai Phong, a 22,000 m³/h unit for the Shindong Vina ship paint shop (Quang Nam), and a 36,000 m³/h unit delivered to Hai Phong in May 2026. The photos show the 36,000 m³/h unit at the DryMax factory.
The customer's problem
A large multi-section unit that had to be fully assembled and tested at the factory before the long haul to Hai Phong.
ENCO's solution
Assembled, tested and packed at the DryMax factory; shipped and delivered in May 2026.
Results
- Shipped and delivered in May 2026

Photos from the site









